Posts published in “Proposed Stations”
बिहार की राजधानी पटना में अंडरग्राउंड मेट्रो का काम शुरू हो गया है। मुख्यमंत्री नीतीश कुमार ने निर्माण कार्य का शुभारंभ किया। पहले अंडरग्राउंड मेट्रो…
पटना मेट्रो के 24 स्टेशनों में 12 होंगे अंडरग्राउंड, यहां देखें कहां-कहां से पकड़ी जा सकेगी गाड़ी पटना मेट्रो के एलिवेटेड रूट के बाद अब…
Patna Medical College Hospital (PMCH), a prominent medical centre in the state capital, will soon get Metro connectivity as the upcoming PMCH metro station under…
Plan to connect Patna metro with airport;
new terminal building by 2023
Former Union minister and Sahib MP Prasad instructed the officials concerned to
expedite the work to widen the Peer for smooth traffic flow at Patna airport.
“Drainage system at Patna airport will be improved so that it can support the infrastructure needed for
the world-class terminal building coming up in Patna. The plans are also there to connect Patna metro
rail line with Patna airport, so that passenger will not face any traffic problems,” he said on Saturday
after the Airport Advisory Committee (AAC) meeting here.
Patna Metro underground metro stations construction A Patna Metro Rail Corporation (PMRC) official said the area near Gandhi Maidan, PMCH and PU has been barricaded…
Patna and Bihta Airport will be connected to The Metro. In first phase 12-12 Metro station are being developed between Danapur and Mithapur ,and between…
Here is the complete Information of Patna Metro Rail in one picture. Information on Metro Corridor and Stations – Phase 1
PROPOSED METRO CORRIDORS LENGTH (K.M.) PHASE – I CORRIDOR-IA East-West Metro Corridor Danapur-Mithapur/Bypass Chow Via Patna Railway Station 14.50 CORRIDOR-IB Digha Link Metro Corridor Digha Ghat-High Court/Vikas…
CORRIDOR-4 Mithapur/Bypass Chowk-Phoolwari Sharif/AIIMS Total length in KM : 11.00 Route 4 : Proposed Routes Bypass Chowk/Mithapur to Phulwari Shariff/AIMS via Anisabad along NH 30…